Short possessions, fixed scope, no room for rework.

GRABO High Flow handling application

The job

Infrastructure fixings go into tunnel linings, bridge structures, retaining walls and station fabric — heavy concrete, frequently overhead, and usually inside a short access window.

Where the tool fits

Precast tunnel segments and finished concrete structures are good vacuum surfaces.

When the possession is four hours long, consistent first-time-right holes matter more than raw speed, and machine-set depth removes a whole category of rework.

Confined and enclosed

Tunnels concentrate dust. Capture at source is a serious control, not a convenience.

Assurance

Infrastructure clients audit anchor installation. Consistent, specified hole geometry is easier to evidence when it is machine-controlled.

Typical work